Strip out redundant laboratory equipment before carrying out specialist decontamination and disposal required by the equipment’s previous use.
Once the unwanted laboratory equipment was removed and the area declared safe, the laboratories were refurbished to a clinical standard with the installation of specialist fume cabinets and laboratory furniture. Redecoration involved applying specialist paints to walls and ceilings.
Due to the long delivery lead time for the laboratory equipment, the programme was developed in conjunction with our client and supplier to ensure management and achievement of agreed completion dates.
Will your building upgrade require removal and decontamination of equipment? Call 0117 933 9000 or email us for advice