River Gate House – Office Refurbishment

Client: AWW Architects Project value: £50k

‘Office refurbishment, but with no skips allowed on site.’

Our Brief

Complete refurbishment of an existing office reception area and meeting rooms, while keeping the offices operational. Site characteristics precluded use of on-site skips and required daily removal of debris by truck.

Works and special challenges

As well as creating a new temporary reception entrance, so staff and visitors were separated from the works, we stripped out existing lighting, installed new plastered ceilings, glass partitions, floor coverings, furniture and lighting, and decorated. We also undertook alterations to air conditioning and electrical services.

Works were carefully co-ordinated so the offices could remain operational. Daily close liaison with our client enabled works to be programmed around their requirements on the way to successful project completion.

Main areas of expertise

  • Strip out
  • Air conditioning
  • Lighting
  • Electrical
  • Joinery
  • MF suspended ceilings
  • Plastering
  • Decoration
  • Jointless glass partitions
  • Flooring